Splitting a single production run across multiple European delivery points, cleanly.
Multi
port delivery
1
point of contact
Split
planned at origin
01 The challenge
A multinational retailer needed one Bangladesh production run split across several European distribution centres, each with its own paperwork and timing.
02 Our approach
KWT planned the split at origin, prepared destination-specific documentation, and routed via the right hubs so each portion reached its port on schedule.
03 The result
Each distribution centre received the correct goods and documents, coordinated from a single point of contact.
Facing something similar? Tell us the deadline and the cargo.
Get a Quote